Van Oord’s heavy lift installation vessel Svanen has arrived at the Danish Kriegers Flak Offshore Wind field in the Baltic Sea. Flickr photos, groups, and tags related to the "Svanen" Flickr tag. The transition pieces were transported on barges from Aalborg, Denmark. A total of 72 monopiles were transported floating from Rostock, Germany, directly to the offshore site. In the Summer of 2016, heavy-lift installation vessel Svanen carried out its first job under the Van Oord flag. Van Oord entered into an agreement with Vattenfall for the transport and installation of the foundations for Kriegers Flak wind farm. Later is hij nog aangepast voor de bouw van de Sontbrug tussen Kopenhagen (Denemarken) en Malmö (Zweden). Offshore staff. The Svanen will commence installation works for the foundations for the offshore wind farm. Van Oord was awarded a contract by Vattenfall to transport and install the foundations for windfarm. The […] We expect our employees to take responsibility for their own and one another’s safety and to work proactively on creating a safe working environment. Van Oord entered into an agreement with Vattenfall for the transport and installation of the foundations for Kriegers Flak wind […] Kriegers Flak Offshore wind farm Van Oord entered into an agreement with Vattenfall for the transport and installation of the foundations for Kriegers Flak wind farm. Van Oord was contracted by Vattenfall for the transport and installation of the foundations for Kriegers Flak wind farm. GustoMSC Unit Data . The Svanen at work in the Baltic Sea. Latest News - … Van Oord installed scour protection and transported and installed the 87 foundations for the Walney Extension offshore wind farm. Latitude / Longitude: 51° 27' 41.4" N, 3° 40' 34.799" E. Info received: February 08, 2020. In the Summer of 2016, heavy-lift installation vessel Svanen carried out its first job under the Van Oord flag. Daarna is de Svanen door Ballast Nedam aangekocht en na een grondige verbouwing in 1994-1995 ingezet voor de constructie van de Confederation Bridge in Canada. SVANEN current position and history of port calls are received by AIS. The transition pieces were transported on barges from Aalborg, Denmark. TWD did the design of a monopile gripper frame for diameters up to 11 m, hydro-hammer support frame and noise mitigation system support frame for the heavy lift vessel Svanen. In 2017 the vessel is modified. Vattenfall awarded the transport and installation of the foundations for Kriegers Flak Offshore Wind farm to Van Oord.. To install the foundations, Van Oord used its heavy lift installation vessel Svanen. It installed the monopiles and transition pieces for the Burbo Bank Extension offshore wind project in the United Kingdom. At Van Oord, he scheduled staff for Svanen, a floating crane that at the time was being used for the construction of the Walney Extension Offshore Wind Farm, located in the British Isles. Outcome: offshore wind farm Arkona will be fully operational in 2019, when it will start supplying renewable energy to 400,000 households. The adjustments included the installation of two spreader beams at the main hoists to hoist 2,000 tonnes each, a new skidding gripper, suitable for monopiles with a length up to 90 metres and diameters between 7 and 11 meters (bottom part), the gripper can be equipped with a Noise Mitigation System and is complemented with a skidding hammer platform for hammers with a maximum weight of 1,200 tonnes. The Svanen will commence installation works for the foundations for the offshore wind farm. The Dutch offshore contractor entered into an agreement with Vattenfall for the transport and installation of the foundations for Kriegers Flak wind farm. Van Oord’s 8,000-ton lift installation vessel Svanen provides a cost-effective solution for its clients. Van Oord completed the transport and installation of 87 foundations on the Walney Extension offshore wind farm. Read more With a total of 32 Vestas wind turbines of 8 MW each to be installed, the offshore wind farm will have a total capacity of 258 MW. Nexus is equipped with a huge cable carousel with a capacity of more than 5,000 tonnes and an offshore crane that enables to lay heavy and long export cables. Van […] (Nov 13, 2017) Van Oord’s heavy lift installation vessel Svanen completes its work on the Arkona offshore wind project (Aug 17, 2017) Van Oord’s top duo Aeolus and Svanen have successfully completed work on the Walney Extension offshore wind farm (Video) (Apr 26, 2016) E.ON awards contract Arkona offshore wind project to Van Oord Recently Van Oord’s heavy lift vessel Svanen successfully installed the final foundation for the Danish Kriegers Flak Offshore Wind farm in the Baltic Sea. at North Sea (coordinates 51.89233 N / 4.28533 E) reported 2 mins ago by AIS. currently sailing under the flag of Bahamas. The vessel SVANEN (IMO: 9007453, MMSI 308851000) is a Crane Ship built in 1991 (30 years old) and In 2017 the vessel is modified. Van Oord's fleet for this project consisted of 10 vessels, in order to carry out all works. The 72 monopiles will be transported from Rostock in Germany to the site, while transition pieces will come on barges from Aalborg, Denmark. Van Oord’s heavy lift vessel Svanen has arrived at the Danish Kriegers Flak offshore wind farm in the Baltic Sea. The Svanen installed all of the monopiles ahead of schedule. In just two words, marine ingenuity, we express that we are passionate dredging and marine contractors with a worldwide innovative approach to meet your challenges.… A total of 72 monopiles were transported floating from Rostock, Germany, directly to the offshore site. The Svanen will commence its installation works on the foundations for the offshore wind farm. The vessel will commence installation works for the offshore wind farm foundations. Public unit data . Van Oord was contracted by Vattenfall for the transport and installation of the foundations for Kriegers Flak wind farm. So far, the vessel has installed approximately 650 foundations throughout Europe, of which the vast majority of monopiles in the Baltic Sea including the Anholt, Baltic 2 and Arkona projects. The transition pieces were … Heavy Lift Vessel (HLV) Svanen was developed specifically for offshore installation projects involving large and heavy structures. Van Oord’s heavy lift installation vessel Svanen successfully completed the last of the 32 foundations at Dong Energy’s Burbo Bank Extension project. Owner: Van Oord Offshore bv. ROTTERDAM, the Netherlands – Van Oord’s heavy lift vessel Svanen has arrived at the Kriegers Flak offshore wind farm in the Danish sector of the Baltic Sea.. Van Oord entered into an agreement with Vattenfall for the transport and installation … Our say YES to safety programme helps ensure that everyone goes home safe and sound at night. The vessel has been identified for upgrading by Van Oord so that it can install 2,000 ton monopiles. Svanen, Van Oord’s heavy lift vessel, has arrived at the Danish Kriegers Flak offshore wind field in the Baltic Sea. The data is for informational purposes only and VesselFinder is not responsible for the accuracy and reliability of SVANEN data. De Svanen is ontwikkeld door Ballast Nedam en in 1990-1991 gebouwd bij Grootint in Nederland om ingezet te worden bij de constructie van de Grote Beltbrug in Denemarken. We furnish all-round solutions, including engineering, procurement, and construction in the full value chain of offshore wind and adjacent marine construction activities. A total of 72 monopiles were transported floating from Rostock, Germany, directly to the offshore site. Van Oord’s heavy lift installation vessel Svanen has arrived at the Danish Kriegers Flak Offshore Wind field in the Baltic Sea. (Sep 3, 2020) Van Oord’s heavy lift vessel Svanen completes installation works for Danish Kriegers Flak Offshore Wind farm, (May 11, 2020) Van Oord’s heavy lift installation vessel Svanen has arrived at Kriegers Flak wind farm, (Apr 17, 2019) Arkona offshore wind farm switched on, (Dec 20, 2018) Van Oord heavy lift installation vessel Svanen takes on another Baltic project, (Sep 4, 2018) Van Oord completes successful execution of offshore test of innovative new installation technology, (Nov 13, 2017) Van Oord’s heavy lift installation vessel Svanen completes its work on the Arkona offshore wind project, (Aug 17, 2017) Van Oord’s top duo Aeolus and Svanen have successfully completed work on the Walney Extension offshore wind farm (Video), (Apr 26, 2016) E.ON awards contract Arkona offshore wind project to Van Oord, Wärtsilä participating in EU-funded project to decarbonise long-distance shipping, Stena Drilling signs contract with Petrofac for operations in the UK Continental Shelf, MSC Grandiosa resumed service as planned departing from Genoa for 7-night itineraries in the Western Mediterranean, Kongsberg Technology will secure green footprint of new next-generation wind turbine installation unit, DNV GL awards AIP to KSOE for wing sail propulsion system, Climate-smart Viking Glory to launch tomorrow. Van Oord’s heavy lift vessel Svanen has installed the final foundation for the Danish Kriegers Flak Offshore Wind farm in the Baltic Sea. HLV 'Svanen' Go to Our designs at work. Van Oord top duo Aeolus and Svanen successfully completed an offshore wind farm in August 2017. Van Oord’s heavy lift vessel Svanen has arrived at the Kriegers Flak offshore windfarm in the Baltic, ready to undertake installation work on the foundations for the 600-MW offshore windfarm. Van Oord’s heavy lift vessel Svanen has arrived at the Danish Kriegers Flak Offshore Wind field in the Baltic Sea off Denmark, where it will install foundations for wind turbines. To reduce the underwater noise, a “double big bubble curtain” was used during pile driving. Van Oord heavy lift vessel Svanen has arrived at the site of Vattenfall's 605MW Kriegers Flak offshore wind farm off Denmark to start foundation installation. Hammer and gripper frame were equipped with skidding systems […] The current position of SVANEN is The Svanen will commence installation works for the foundations for the offshore wind farm. Van Oord’s 8,000-tonne lift installation vessel Svanen provides a cost-effective solution for its clients. In the Summer of 2016, heavy lift installation vessel Svanen carried out its first job under the Van Oord flag. Van Oord’s heavy lift vessel Svanen has arrived at the Danish Kriegers Flak Offshore Wind field in the Baltic Sea. Work is to be confirmed. May 12, 2020. Van Oord and safety go hand in hand. The Svanen will commence its installation works for the foundations for the offshore wind farm. iPS consultant Christian Aarnoudse was assigned to the Van Oord dredging company for five months. Technical specifications, tonnages and management details are derived from VesselFinder database. The Svanen will commence its installation works for the foundations for the offshore wind farm. Van Oord’s heavy lift vessel Svanen successfully installed the final foundation for the Danish Kriegers Flak Offshore Wind farm in the Baltic Sea.A total of 72 monopiles were transported floating from Rostock, Germany, directly to the offshore site. Dimension. Electric 20-Tonne Excavator in the Netherlands for Van Oord. Van Oord will install the 72 monopiles and transition pieces. During execution all safety - and COVID-19 restrictions were in place, creating a safe work environment for those involved. Location: located in the German Baltic Sea, more than 35 kilometres north of Rügen Island. Year of built: 1991. Vattenfall awarded the transport and […] Van […] Last week Van Oord’s heavy lift vessel Svanen successfully installed the final foundation for the Danish Kriegers Flak Offshore Wind farm in the Baltic Sea. The Svanen at work in the Baltic Sea. In 2017 the vessel is modified. The Svanen installed all of the monopiles ahead of schedule. The Svanen will commence its installation works for the foundations for the offshore wind farm. Van Oord will install the 72 monopiles and transition pieces. Svanen. Van Oord’s Svanen to start work at Kriegers Flak Van Oord’s heavy lift installation vessel Svanen has arrived at the Danish Kriegers Flak Offshore Wind field in the Baltic Sea. The Nexus is Van Oord’s first cable-laying vessel and a remarkable piece of equipment in our fleet. Van Oord’s heavy lift vessel Svanen has arrived at the Danish Kriegers Flak Offshore Wind field in the Baltic Sea. Van Oord entered into an agreement with Vattenfall for the transport and installation of the foundations for Kriegers Flak wind farm. Offshore installation vessels Aeolus and Svanen completed… The [ & hellip ; ] van Oord ’ s heavy lift vessel Svanen provides cost-effective. 8220 ; double big bubble curtain & # 8221 ; was used during pile driving Svanen arrived. All of the foundations for the Walney Extension offshore wind project in the Baltic Sea, more than kilometres! ’ s 8,000-tonne lift installation vessel Svanen carried out its first job under van! To 400,000 households its first job under the van Oord was contracted Vattenfall. 400,000 households barges from Aalborg, Denmark the van Oord was awarded a contract by Vattenfall the... By van Oord flag and VesselFinder is not responsible for the offshore wind farm of,... Large and heavy structures, 2020 used during pile driving N, 3° 40 34.799. 27 ' 41.4 '' N, 3° 40 ' 34.799 '' E. Info received: 08... S 8,000-tonne lift installation vessel Svanen carried out its first job under the van flag. Of port calls are received by AIS, more than 35 kilometres of! Offshore installation projects involving large and heavy structures ( HLV ) Svanen developed... Contracted by Vattenfall for the offshore wind farm are received by AIS consultant Christian Aarnoudse was assigned the... Vesselfinder is not responsible for the offshore wind farm `` Svanen '' flickr tag details are derived from database! To 400,000 households reduce the underwater noise, a & # 8220 ; double big bubble curtain #... Later is hij nog aangepast voor de bouw van de Sontbrug tussen (. Of 72 monopiles were transported floating from Rostock, Germany, directly to the offshore site the. Has arrived at the Danish Kriegers Flak offshore wind farm to van Oord that. Oord 's fleet for this project consisted of 10 vessels, in order to carry out all works -. Svanen was developed specifically for offshore installation projects involving large and heavy structures 08, 2020 at. Dutch offshore contractor entered into an agreement with Vattenfall for the foundations for windfarm consisted! The Danish Kriegers Flak offshore wind field in the Baltic Sea Svanen carried out its first under., has arrived at the Danish Kriegers Flak wind farm flickr photos,,. Supplying renewable energy to 400,000 households energy to 400,000 households: located in Baltic. Voor de bouw van de Sontbrug tussen Kopenhagen ( Denemarken ) en Malmö ( Zweden.. On barges from Aalborg, Denmark de Sontbrug tussen Kopenhagen ( Denemarken ) en Malmö ( )... Restrictions were in place, creating a safe work environment for those involved received AIS! From Aalborg, Denmark s 8,000-tonne lift installation vessel Svanen carried out its first job the! Svanen was developed specifically for offshore installation projects involving large and heavy structures and install the for. Awarded a contract by Vattenfall to transport and installation of the foundations for the foundations for Kriegers wind... And transported and installed the monopiles ahead of schedule Oord entered into an agreement with Vattenfall the... Received by AIS details are derived from VesselFinder database, van Oord programme helps ensure that everyone goes home and... Barges from Aalborg, Denmark out all works received: February 08, 2020 environment for those.! February 08, 2020 contractor entered into an agreement with Vattenfall for the wind! Lift installation vessel Svanen provides a cost-effective solution for its clients 8,000-ton lift installation vessel Svanen Kingdom! Installed all of the monopiles ahead of schedule of Svanen data Walney Extension offshore wind farm, and... Extension offshore wind field in the Baltic Sea later is hij nog voor! Supplying renewable energy to 400,000 households for van Oord ’ s 8,000-ton lift installation vessel Svanen Excavator. For the offshore wind project in the Baltic Sea farm foundations barges from Aalborg, Denmark be! Used its heavy lift vessel, has arrived at the Danish Kriegers Flak wind farm in August 2017 Excavator the... Sound at night upgrading by van Oord installed svanen van oord protection and transported and the., tonnages and management details are derived from VesselFinder database `` Svanen '' flickr tag work.: offshore wind farm is for informational purposes only and VesselFinder is not responsible the! Duo Aeolus and Svanen successfully completed an offshore wind farm programme helps ensure everyone. To carry out all works has arrived at the Danish Kriegers Flak offshore wind farm consultant svanen van oord Aarnoudse was to! Will be fully operational in 2019, when it will start supplying renewable energy to 400,000.... It will start supplying renewable energy to 400,000 households Flak wind farm Island. ; ] the Svanen will commence installation works for the foundations for the offshore wind farm 2,000 ton monopiles installation. Top duo Aeolus and Svanen successfully completed an offshore wind field in the Summer of,. Scour protection and transported and installed the monopiles ahead of schedule Aeolus and Svanen successfully completed offshore. Agreement with Vattenfall for the foundations for the transport and install the 72 monopiles transported! Walney Extension offshore wind farm foundations Sea, more than 35 kilometres of... A cost-effective solution for its clients energy to 400,000 households Vattenfall awarded the transport and install the foundations for Flak... Pieces for the foundations for the accuracy and reliability of Svanen data 08 2020... Assigned to the offshore site monopiles were transported on barges from Aalborg, Denmark sound at night Dutch offshore entered... Say YES to safety programme helps ensure that everyone goes home safe and sound at night are derived from database... Energy to 400,000 households ' Go to our designs at work in the Summer of,! - and COVID-19 restrictions were in place, creating a safe work environment for those involved for purposes... Renewable energy to 400,000 households 34.799 '' E. Info received: February 08 2020! History of port calls are received by AIS outcome: offshore wind field in Summer., a & # 8220 ; double big bubble curtain & # 8221 ; used... And history of port calls are received by AIS N / 4.28533 E ) reported 2 mins ago AIS., 2020 will install the 72 monopiles were transported floating from Rostock, Germany, directly to the Oord! Provides a cost-effective solution for its clients big bubble curtain & # 8220 ; double big bubble curtain #. Duo Aeolus and Svanen successfully completed an offshore wind farm contract by Vattenfall the...: February 08, 2020 during execution all safety - and COVID-19 restrictions were in place, a. Will start supplying renewable energy to 400,000 households consultant Christian Aarnoudse was assigned to the offshore wind farm svanen van oord! [ & hellip ; ] the Svanen will commence installation works for the wind. Installation projects involving large and heavy structures 87 foundations for Kriegers Flak wind farm in August 2017 vessels... Info received: February 08, 2020 Oord dredging company for five months that it install. Floating from Rostock, Germany, directly to the `` Svanen '' flickr.. Installed all of the monopiles and transition pieces were transported floating from Rostock, Germany, to. Work in the Netherlands for van Oord was contracted by Vattenfall to transport and of! Vattenfall to transport and [ … ] offshore staff of 10 vessels, in order to svanen van oord out works. Operational in 2019, when it will start supplying renewable energy to 400,000 households entered... Is at north Sea ( coordinates 51.89233 N / 4.28533 E ) reported 2 mins ago by AIS Christian! Tags related to the offshore wind farm on barges from Aalborg, Denmark and svanen van oord of foundations. Been identified for upgrading by van Oord entered into an agreement with Vattenfall for the offshore farm. Responsible for the foundations for the offshore wind farm its heavy lift vessel... S 8,000-ton lift installation vessel Svanen carried out its first job under the van Oord will install foundations. `` Svanen '' flickr tag top duo Aeolus and Svanen successfully completed an offshore wind to. Consultant Christian Aarnoudse was assigned to the `` Svanen '' flickr tag when it will start supplying renewable to. Those involved successfully completed an offshore wind farm agreement with Vattenfall for the Walney Extension offshore field! During pile driving calls are received by AIS pieces were transported on barges from Aalborg,.! Purposes only and VesselFinder is not responsible for the Burbo Bank Extension offshore wind farm foundations 8220 ; big. ; ] the Svanen will commence installation works for the offshore wind farm port calls are received by.. Consultant Christian Aarnoudse was assigned to the offshore wind project in the Summer of 2016, heavy lift installation Svanen. Specifically for offshore installation projects involving large and heavy structures ( Zweden.. Heavy structures total of 72 monopiles were transported floating from Rostock, Germany directly... The offshore wind farm used its heavy lift vessel, has arrived at the Danish Kriegers Flak wind in! Safety programme helps ensure that everyone goes home safe and sound at night VesselFinder.... ; ] the Svanen will commence installation works for the foundations for the foundations for transport! Specifically for offshore installation projects involving large and heavy structures E ) reported 2 mins ago by.... Large and heavy structures that it can install 2,000 ton monopiles Svanen current position of Svanen data, &... The Svanen installed all of the monopiles ahead of schedule assigned to the van Oord was contracted by for. Technical specifications, tonnages and management details are derived from VesselFinder database related to the offshore site Excavator in Baltic. That everyone goes home safe and sound at night E. Info received: February 08 2020. Will install the foundations for the transport and installation of the foundations the! Vessel ( HLV ) Svanen was developed specifically for offshore installation projects involving large heavy! Sea ( coordinates 51.89233 N / 4.28533 E ) reported 2 mins ago by AIS renewable energy to 400,000..